The work, and how it runs.

Fire alarm installations, system takeovers, suppression and remedial works, across Dublin and Leinster. Here is how a project actually runs, from the first visit to the certificate.

How a project runs

Four stages, no surprises.

01

Survey

We walk the building with you and record what is there: panel type and age, zone layout, device count and condition, escape routes, emergency lighting coverage, extinguisher provision. If there is an existing register we read it. If there is not, that tells us something too.

You get a written summary of what is installed, what is not compliant, and what it would take to fix. That is free, and it is yours whether you use us or not.

02

Design and quotation

Category and coverage are set against I.S. 3218 and the building's use, not against a price target. You get zone drawings, a device schedule, a cause and effect outline, and a fixed quotation that separates the installation from the ongoing servicing so you can see both.

Where a project is going to tender, we provide the pack in the format the specifier asked for.

03

Installation

Scheduled around your building rather than ours. In live environments, data centres, wards, classrooms, most first fix happens out of hours and every isolation is agreed in writing before it happens. Nothing gets left on test overnight without you knowing.

Existing systems stay functional while the new one goes in. Cutover is planned, dated, and short.

04

Commissioning and handover

Every device tested and signed off, cause and effect proven, and the certification issued. You get as installed drawings, the zone map, operating instructions, the commissioning certificate and a fire safety register set up and started, not an empty folder.

Then we show whoever manages the building how to do the weekly test properly, because that is the record a fire officer reads first.

Typical briefs

The jobs that come up most.

New installation

Fit out or new build.

  • Full I.S. 3218 alarm system
  • Emergency lighting to I.S. 3217
  • Extinguisher provision
  • Certification for the fire safety certificate file
Takeover

Inheriting someone else's system.

  • Condition survey and gap report
  • Bring the register up to date
  • Remedial works quoted separately
  • Move onto a proper service cycle
Suppression

Where water is the wrong answer.

  • Comms rooms and plant rooms
  • Inert gas and water mist
  • Commercial kitchen systems
  • Interlocks with the alarm system
Remedial

After an inspection went badly.

  • Close out fire officer findings
  • Close out insurer requirements
  • Priced by item, so you can stage it
  • Evidence pack when it is done

Named case studies

We are adding these as clients give permission, which in critical environments takes a while and is worth waiting for. In the meantime, if you are evaluating us for a tender or a contract, ask and we will put you in touch with a reference in your sector.

Start with the survey.

Free, no obligation, and you keep the written findings either way.